Wednesday, October 5, 2022

Getting ready for Babies

 I saw this picture on Facebook the other day.  It was a photo of a baby goat and it was labeled "Bankruptcy Starter Package."  And I totally get it.  Between feed and hay and meds when needed, it can get kinda pricy.  But since we are on a tight budget, we do a lot with what we have or can find cheaply.

Our goats were a gift.  My son bought them for us for Christmas.  We built our barn from mostly wood from our property.  This serves a dual purpose.  Much of the property is overgrown, and older trees get disease or rot and younger ones cannot thrive under crowded conditions.  This helps us thin the trees so the ones that we keep are strong and healthy.

We had to buy the siding and the roof material, as well as some wood for support, but all the cross pieces and uprights were cut from oak or cedar from the property.  

Even the fence posts came from the property.  

We had to cut this huge tree that was in the way of getting sunlight to the garden.  Randy used his chain saw mill to make lumber for the stalls and fencing.  Any wood that couldn't be used for the barn was split for firewood.

The barn is 15' x 15' and is divided into three sections.  The first half is for two does, a quarter is for Mr. Bill, and the other quarter is for feed and hay storage.  Eventually, we will be moving  Mr. Bill to a new location and we will use his quarters for babies.  The hay storage will be relocated and the current space will be used for milking.  

We spent less than $1000 on the barn and fence.  Of course, this was built in 2021.  Prices are much different now.  Since we are breeding our does this month, we are preparing for babies.  We have enlarged the pasture and cross-fenced some of it so we will be able to re-seed it.  Goats clear weeds and brush, it's true.  And everything else in their path.

We were at our local feed store and they had a stack of metal outside.  We asked about it and they told us their mowers were shipped in these metal crates.  They were selling them and we made them an offer of $25 per crate.  Our first three crates were able to build the four gates that we needed for the new pasture.  

 





For less than $100, we were able to get four gates that are heavy-duty and strong.  This would have normally cost us over $500 if we had purchased from the local home improvement or feed store.  Now we are working on a small barn for Bill so we can start preparing for babies.  Goats have a five-month gestation period so if we breed now, in early spring we should be blessed with little ones. 

Saturday, June 19, 2021

Getting Ready for the Goats

 My son, maybe with a little tongue in cheek, told us he was buying us goats.  My hubby had always said that he would like to have some goats to milk, but we have never really had a place to raise them.  So since we have a few acres here, he thought now would be a great time.  

Here was the problem.  We have no fences.  We have no barn.  We have no money.  So we started small and kept working on it.  First the barn.  We are getting three goats, two does and a buck.  They are just babies right now but we had to think about our future....and theirs.  So we designed a 15 foot by 15 foot goat barn.. It is taller in the front, and slopes to the back.  It can easily be divided into stalls and even an area for milking.  We looked at lumber but it was sooooooo expensive so we economized where we could.  The uprights are actually logged from the property.  They are oak trees that were taken from places where they were either too bunched up or bent over.  We cut them, trimmed them, and set them in concrete.  

We bought inexpensive sheathing for the sides and corrugated fiberglass for the roof.

We have an old concrete mixer that we purchased over 30 years ago.  We have moved it from Arizona to Colorado, and now to Missouri.  We used it to mix the concrete to hold the posts in place.  
We stained it with an inexpensive wood stain in barn red.  It took nearly four gallons.  We are still in the process of finishing the inside and the front.  





Whew!  This was quite the project.  Thankfully we had pretty good weather while we were doing it.  We used lumber from our scrap pile and our neighbor even offered some from his stash.  To place the poles, we used a gas powered auger.  It was supposed to be a one-man machine, but it took one man....and one woman to hold it steady enough.  Our muscles were sore, but not as bad as they might have been if we had dug by hand!
 

                  On to the next project!  A water catchment system.